Infor SyteLine supports the creation of Bills of Materials for manufactured parts. A Bill of Material (BOM) is the set of materials needed to complete each of the operations. The BOM can be multi-level, which means one of the materials required for operation xyz is a subassembly that has its own routing and BOM.

  • Changes to Bills of Materials are automatically captured at the time a job is released. You can create a new BOM by copying it from another inventory item (which uses the current routing and BOM), another job, estimate job, or a production schedule item or release.
  • Create both the routing and Bill of Material on one screen using Engineering Workbench
  • Copy bills of materials from jobs, items, estimates, or production schedules
  • Assign fixed and variable overhead rates to materials
  • Material Use-Up Report
  • Set items to back flush
  • Enter the percentage of scrap expected for use with planning or purchasing
  • Effectiveness and obsolescence dates
  • Phantom items
  • Non-inventory items
  • Where used
  • CAD BOM import
  • Compliance Tracking

 
You can create a new BOM by copying it from another inventory item (which uses the current routing and BOM), another job, estimate job, or a production schedule item or release.
 