Use the Infor SyteLine Engineering Change Notices (ECN) form to control and track revisions made to a Bill of Material or to the routing of an item. The ECN process is crucial in ensuring high quality, safety, and consistency of products.
- Approvals of changes before it can be used on jobs or estimates
- Mass replace/delete
- Enter a priority code to determine the order in which you want to implement the ECN
- Maintain reason codes
- Maintain distribution codes for who muct be notified of teh ECN change
- Identify what needs to be changed
- Copy ECN functionality
- Revision Control
- Track ECN and revision history
- Maintain an audit trail of changes to teh ECN record throughout the change process
- Reporting that will allow you to see the jobs that are affected by ECNs
- Maintain a comprehensive audit trail of changes to the Bill of Material and routings
- Update part or document revision levels automatically upon incorporating
Use the Infor SyteLine Engineering Change Notices (ECN) form to control and track revisions made to a Bill of Material or to the routing of an item.