Menu

Use the Infor SyteLine Engineering Change Notices (ECN) form to control and track revisions made to a Bill of Material or to the routing of an item. The ECN process is crucial in ensuring high quality, safety, and consistency of products.

  • Approvals of changes before it can be used on jobs or estimates
  • Mass replace/delete
  • Enter a priority code to determine the order in which you want to implement the ECN
  • Maintain reason codes
  • Maintain distribution codes for who muct be notified of teh ECN change
  • Identify what needs to be changed
  • Copy ECN functionality
  • Revision Control
  • Track ECN and revision history
  • Maintain an audit trail of changes to teh ECN record throughout the change process
  • Reporting that will allow you to see the jobs that are affected by ECNs
  • Maintain a comprehensive audit trail of changes to the Bill of Material and routings
  • Update part or document revision levels automatically upon incorporating


Use the Infor SyteLine Engineering Change Notices (ECN) form to control and track revisions made to a Bill of Material or to the routing of an item.
 
Top